USAfixTM - Repair Guide (RG) - Master Email RG
- Replace the leaking hose or checkvalve.
 Level of Difficulty - MEDIUM  Estimated Completion Time - 30 minutes
TASKI - SWINGO 350B

Tools Required
Tool 
Torx T30

Parts Required
PartDescriptionPriceAvailablePurchase
192-0639 Solution hose (sold by the inch) $3.30 Back Order Qty:
192-8881 PVC hose (sold by the inch) $8.43 Back Order Qty:
192-8882 Check valve $42.08 Back Order Qty:


Step Procedure & Parts & Tools
1 LIFT THE RECOVERY TANK FROM THE MACHINE AND CARRY TO DRAIN TO EMPTY. PUSH THE MACHINE OVER A DRAIN AND REMOVE THE YELLOW SOLUTION FILTER CAP TO DRAIN THE SOLUTION TANK.

2 RAISE THE TANK COVER UP UNTIL IT POPS OFF MACHINE.

3 LOCATE THE 2 HOSES COMING UP THRU THE SOLUTION TANK. PULL THE HOSE CUFFS OFF HOSES.

4 REMOVE THE 4 BOLTS HOLDING THE BATTERY COVER.
Torx T30

5 SLIDE BOTH BATTERIES FROM THE BATTERY COMPARTMENT. NO NEED TO DISCONNECT THE CABLES.

6 REMOVE THE 2 BOLTS IN THE BATTERY COMPARTMENT.
Torx T30

7 LOOSEN THE BOLT ON THE FRONT OF THE SOLUTION TANK.
Torx T30

8 REMOVE THE 2 SOLUTION TANK BOLTS ON EACH SIDE OF THE TANK.
Torx T30

9 RAISE THE SOLUTION TANK UP.

10 LOCATE THE CHECK VALVE.

11 PULL THE HOSES FROM EACH END OF THE CHECK VALVE.

12 REMOVE THE HOSES BETWEEN THE CHECK VALVE AND MANIFOLD.

13 PULL TO DISCONNECT THE HOSES FROM THE MANIFOLD.

14 PULL THE HOSE, THAT CONNECTS TO THE CHECK VALVE, FROM THE PUMP

15 REVERSE STEPS 1 THRU 14 TO REPLACE THE HOSES, CHECK VALVE AND TO REASSEMBLE THE MACHINE. HOSES SOLD BY THE INCH.

PartDescriptionPriceQty
192-0639 Solution hose (sold by the inch) $3.30 Qty:  
192-8881 PVC hose (sold by the inch) $8.43 Qty:  
192-8882 Check valve $42.08 Qty: